Why wait to move into your dream home longer than you need to? Metricon can start building your new home in as little as 8 weeks*
Terms and eligibility criteria apply. Available only on titled and sewered land in Queensland build region. Any delay in land registration will alter/void the discount and any guaranteed timeframes outlined.
Why wait to move into your dream home longer than you need to? Introducing Fast Track by Metricon – a service designed to make building a new home faster and more affordable.
If you have registered land (or land that is registering soon) you may qualify for Metricon’s FastTrack 8 Week to Site Start Program. We can have your contract ready in 7 days and start building your new home in as little as 8 weeks from deposit. Plus, you can save thousands off the cost of your home with our FastTrack savings.
With Metricon’s Fast Track program, you can have speed, savings and the surety of knowing when your new home build will start.
Metricon’s FastTrack program will reward you with a FastTrack savings discount where you can save thousands off the cost of your new home.
“I can’t thank you enough for delivering on your FastTrack promise. After paying our deposit on the 4th October, we were on site on the 14th of November. I couldn’t be happier with the job done and how the process is going.” Jason B, Building in Westbrook - 36 Days to Site Start
“I’m delighted about the construction commencement with the FastTrack program. The Studio M appointments followed right after the contract and the construction commenced after, in line with the FastTrack promise to start construction in 8 weeks.” Ganesh R, Building in Warwick - 41 Days to Site Start
If you’re ready to move into your dream home as soon as possible, get in touch with us to see if you qualify for FastTrack by Metricon. Fill out the form below, let us know how to get in touch with you (and where land is located). One of our home experts will be in touch to talk you through the process. They’ll help you find the absolute best solution for your budget and lifestyle. From the home itself, the finer details of your kitchen, bathroom, and flooring, we’re ready to guide you through the process, start to finish.
^Metricon’s FastTrack 8 Week to site start program is available on new deposits from 27.03.2022. Available only on titled land in Queensland build region (as defined on www.metricon.com.au/where-we-build). Written confirmation must be received from Metricon confirming participation in the FastTrack Program. Excludes homes with structural variations outside of the pre-drawn standard design options, and homes built on unsewered sites. Change in home design after date of deposit may void the discount and any guaranteed timeframes. Delays with land registration will alter/void the discount and any guaranteed timeframes outlined. Metricon does not supply the land. Any Council-related applications may alter/void the guaranteed time frames and discount outlined. Available on Freedom by Metricon Homes only. The Freedom by Metricon FastTrack discount is not available with any other offer. Your Studio M Selections appointment will be made for the first available date. To ensure timelines are met, flexibility for dates will be limited and it is your responsibility to ensure that you are available on the nominated date.