*Prices are based on Bingara Gorge packages and Metricon specifications. Bingara Gorge and Metricon exclusive inclusions apply to deposits made from 26.10.2024 onwards and are not redeemable for cash or credit. This offer is not available in conjunction with any other promotion. Prices are based on the specified floorplan and façade. ~Air-con unit size, zones, and outlets determined by home size and design. ^20mm Caesarstone® benchtop for kitchen and bathroom only and to be selected from the builders’ standard range of colours. †Exact floor areas for product allocation are dependent on home design. Colours and styles to be selected from builders’ promotional range. ‡Fence is 1800mm timber with a gate to the side of the home. Package prices exclude external lighting, telephone service, customer account opening fees, stamp duty on land, legal fees, and conveyancing costs (including titles). Please speak to a New Home Consultant for full floor plan details. The land is supplied by Metro Property Development. Land prices and availability are subject to change without notice. All home and land packages are subject to developer approval. Metricon reserves the right to alter images and descriptions without notice. Please consult with a sales consultant for the full list of Bingara Gorge and Metricon exclusive inclusions.
^Saving includes a price reduction of up to $158,000, comprising up to $77,000 off the land price and up to $81,860 off the house price. Savings based on the Vantage 35, Lot 113 Sandstorm Street, Wilton. This offer is exclusive to attendees of the VIP House and Land Information Event on 26 October 2024. Savings may vary with different home and land packages.
Metricon’s ReadyStart “Deposit to Keys in 26 Weeks” Program (the “Program”) is available on deposits for specified Freedom and Designer home and land packages from 26.10.2024 within the Bingara Gorge Estate. No structural changes are permitted. To meet the advertised timeframe, the purchaser must promptly return all necessary paperwork (including attending appointments and signing and returning documents) and provide all required information under the building contract within 14 days. Your Studio M Selections appointment will be scheduled for the first available date, with limited flexibility. It is the purchaser’s responsibility to ensure availability on the scheduled date. Metricon will not be held liable for delays in meeting advertised timeframes due to late submission of documents/information by the purchaser. Construction industry shutdown periods during December/January are excluded from the timeframe and may extend the duration by the length of the shutdown. Third-party delays: Metricon is not responsible for delays in contract preparation, signing, or site start deadlines caused by third parties outside its control. Upon acceptance into the Program, customers may receive keys in 26 weeks starting from the deposit date with Metricon.
For details on the Lifetime Structural Guarantee, visit metricon.com.au/terms-conditions. ABN: 55 201 276 124 | NSW Contractor Licence: 174699C. 20241022.